For the week starting 1/30/12, George Washington Bridge sorth walkway-bicycle path open weekdays and south side closed

Jan 29 2012 Published by under Uncategorized

For the week starting 1/30/12, the George Washington Bridge north side pedestrian walkway and bicycle path will be open daily Monday thru Friday and will close at night from 12am to 6am. It will be closed on Saturday and Sunday. The south side George Washington Bridge pedestrian walkway and bicycle path will be closed daily on Monday thru Friday. It will reopen daily on Saturday and Sunday and will close at night from 12am to 6am.

My understanding is that the George Washington Bridge north side pedestrian walkway and bicycle path has some 10 flights of stairs modified to allow bikes to be walked down instead of carried.

Port Authority Alerts

Share and Enjoy:
  • Print
  • Digg
  • StumbleUpon
  • del.icio.us
  • Facebook
  • Yahoo! Buzz
  • Twitter
  • Google Bookmarks
  • Add to favorites
  • Blogosphere
  • Google Buzz
  • LinkedIn
  • Live
  • MSN Reporter
  • Orkut
  • PDF
  • RSS
  • Technorati
  • Tumblr

Anthony Olszewski
aolsz@bellatlantic.net

No responses yet

Leave a Reply


*